Ventilation Commissioning Certificate

testo 417 ventilation extractor air flow testing part f vent commissioning certificate testing

Are you looking for a Ventilation Commissioning Certificate?

Building Control or your third-party Building Inspector, as part of compliance with Part F of the Building Regulations should request a Ventilation Commissioning Certificate wherever new ventilation is introduced into a building.

Domestic Ventilation Inspection and Commissioning

As part of the certification it is required to not only carry our air-flow testing but inspect ductwork where possible, inlets and outlets as well as an assessment of internal door undercuts and design background ventilation. Background ventilation can include trickle ventilators, wall vents or passive ventilators.

Part F Ventilation Air-flow Benchmark Performance

Depending on your ventilation strategy and locations of the ventilation, commissioning is carried against set criteria by the Building Regulations.

This stipulates the required assessment air-flow rates.

Minimum Extract Ventilation Rates for Intermittent Extract Systems

Extract Ventilation Minimum Flow Rates for Continuous Extract Systems

Whole dwelling ventilation Minimum Flow Rates determined by the number of bedrooms

Have a project in mind? Let’s get to work

We’re friendly and knowledgeable bunch so why not get in touch for a chat. You can always contact Building Compliance Testing with any questions through phone, email or our online chat service.

Don’t worry, we don’t charge for advice given over the phone, so why not ask for a free quote?

Contact us now.

Leave a Reply